Serbia 2012, GFA 23.093,72 m2
Design and construction managment of phase 2 of a refrigerator plant.
Design team: I. Tanaskovic, Z. Matkovic, U. Jankovic, V. Zelic.
Design and construction managment of phase 2 of a refrigerator plant.
Design team: I. Tanaskovic, Z. Matkovic, U. Jankovic, V. Zelic.